Crews for the city were out working in the area approaching the pedestrian bridge over US-75 between Pratt and Manderson. The nearest crossing is four blocks in either direction, which would significantly add to the distance walked by the 75-100 people who use the bridge on an average weekday.
The work is being done on the east side of the bridge along 28th Street to make the entrance to the bridge more accessible. Thanks to the city for putting time and effort into maintaining and improving important pedestrian connections.